The new factory production in the multinational BIMBO Azuqueca de Henares (Madrid) has been heated for 30 evaporative coolers manufactured by MET MANN that develop a total airflow of 1,553,000 m3 / h.
The design and execution of the work has been done by the GRUPO SAN JOSE at different stages, fulfilling the required quality and deadlines.
For MET MANN it has been one of the most important contracts in 2015 and this has allowed us to establish a business relationship with GRUPO SAN JOSE, multinational company and a leading international construction companies.
Our condition of manufacturers, has allowed us to adapt to the technical requirements of the project and its requirements.